Pavilion Report 2014
Uluveu Builders Workshop Report for 2014
SOAP FACTORY REPORT.
Soap factory report starting from February to May 2014. On February the soap sales cost 4740 vt @ 20 vt each. The bottle of oil cost 1400 vt. There are 237 soap sales and 7 plastic bottles sold so it cost up to 6140 vt.
The cash payment are as follows. Oil cost 2600vt for 13 litres. Wages ,we work one day in a week, the cost is 3000vt. The poundary has to be clean so the grass cutter cost 2500vt. The total cost payment is 7600 vt . It means that we have an outstanding of 1460 vt.
March , cash receipt ,there are 164 soap sales @ 20 vt. It cost 3250 vt. The plastic oil sold @ 200vt for 18 plastic bottle. It cost 3600vt so I deposited 2000vt at the NBV so I left with 4880vt. The cash payment ,of the Oil bought of 15 liters @ 200vt cost 3000vt.Wages cost 2000vt . The boundary cost 1500vt plus the outstanding of 1460vt total up to 7960vt. The outstanding for march is total up to 7960 vt. The outstanding for march is 1080vt.
April I paid 80 soap @ 20vt. It cost 1600vt so I paid 10 plastics bottles Oil @ 200vt and it cost 2000vt. Total cost for sales is 3600vt. The payment for oil is 7800vt for 39 litres.The wages 4500vt and small labour for two men digging the toilet cost 2000vt and the total cost is 14300vt. On April I widthrew from the NBV 11780vt plus 1080vt total up to 15380vt.
In May I sold 195 soap @ 30vt and 37 soap @ 20vt costing 6590vt. The plastic oil sold was 11 bottles @ 200vt cost up to 2200vt. 1000vt was deposited at NBV. Remaining vt left was 8790vt.
Cash payment I bought 825 liters of Oil, grass cutter with 2000vt for cleaning the poundary, 5 refil for 600vt ,wages for 7000vt and labour for two men working on the toilet cost 1400vt. So the Total cost was
12650vt.My outstanding is 3860vt. I have to solve the outstanding for june when I receive any money again by selling the soap.Now im sending about.
By Jenny Keith.
Soap made in soap factory by Jenny and ladies, ready to pack for New Zealand sales.
ULUVEU NUWAI PAVILLION REPORT 2014.
Aim of the Project
The aim of the Project is to get all people to have clean and healthy drinking water To supply clean water for children to take baths
Supply people enough water during drought.
Operation.
The Uluveo Nuwai Project was opened on the 12 of January 2013. Since the opening the whole operating system was all in good progress. We were making 2 litres of water in 1mins, the water tank was really full and at least 50- 60 people especially children were using it once a day.
Bathing soap were supplieq from the soap factory for children to use during their baths.
Benefits
1) The Uluveo Nuwai Project is benefiting the Fisher Men association and the people of Maskelyne by producing ice cubes from ice making machine and selling them to Fishermen who are buying fish and selling them to Vila. They are making 40 cubes in a week and selling them to the fishermen for 350vt per cube. They are earning a profit of 12000vt per week.
2) The Uluveo Nuwai system is providing electricity to the only Primary school at Maskelyne.
3) Also it provides electricity to the builders workshop to build furnitures to help the communities.
4) It also supply water to yachties’ who visits Maskelynes if needed.
5) Lastly it assist financially with powers to any meetings held within the nearby village closes to the source when the people of uluveo combine together in an occasion.
Challenges
The pump is operating well but there are also challenges.
1) As of the 15th of May the salt water pump does not pump in salt water for Desalination
2) The operator does not really understand more on how the system really operates especially the pump and the desalination plan.
3) The fisherman association do not pay in their rent of power to make ice cubes in time. The revenue is growing very slowly.
Solution and recommendation .
These are some solution that must be done to solve the challenges.
1) We need our own clear understanding on how to operate and maintain the desilination plan.
2) We need our own ice making machine to make enough revenue.
3) We had another desalination pump sent from Liane on the 21st of September 2013 which was connected and now it is working well.
With this short report, Iwould like to express my thanks to Liane Farry and the NZCHET for the negotiation for this project which helps a lot in clean water and providing electricity for the people of Uluveo to earn their living.
l am enclosing my financial report for last year 2013 and this year 2014.
Date | Income | Amount | Expenses | Amount | Total Balance | |
2013 | Power | Rent | 25 260 vt | ——– | ——- | 25, 260 vt |
2014 | Power | Rent | 9460 vt | ——– | —— | 9, 460 vt |
Total Balance | 34, 720 vt |
All income are from Fisherman Association .
- This year they made up to approximately 600 blocks from December to may. Thank you very much and God bless.
From Pavillion Manager : Benson Tangou.
Donations to The Communities.
1: Pescarus community kindergarten
5 free tanks of chainsaw
1 permanent toilet sit
Free tools supplies for building new kindy classroom
- Lutes community kindergarten
– 5 free tank of chainsaw
- Pelongk community Market House
– 4 free tanks of chainsaw
- Namaru Primary School
– Free power tools suppliesto build new classrooms
9: Future Plan
The -future plan of (the workshop will be expand to help the communities from all the villages of the Uluveu are”:, starting from Okai, Nerieniemb, Ayiomb, Ravuhen Avock Island and the three Villages in the Uluveu Island. As from now on our master plan for the workshop will continue slowly be draft and adjustment will be going on till it completes to be approved by the committees of the palm project. And also hopefully we continue to fulfill our future plans to develop the workshop with our own business class knowledge that God our Creator given us.
10: Challenges
Starting from the operation of the new Management of the workshop, we are facing lots of challenges coming across our Management, we facing problems of power tool breakdown, generator problems, light problems, shortage of tools, Broken tools, and also we facing discrimination issues concerning.
Management Builders and workshop Assets.
With these challenges, we overcome with our faith in God to stand against all evil forces, to develop the workshop is not easy, it’s needs, interest, efforts, commitments voluntary service, patient and shelf trustworthy.
11. Conclusion:
With these reports, we truly confirm to you NZCHET, that we the management of the UBW, we trying harder to upgrade and develop the workshop with our own business class knowledge. This project is our enterprise to benefit the needs of the people of Uluveu Island, Malampa Province and Vanuatu as a whole.
Thank. you,
Compiled by Elder AkurAkur John Manager of Uluveu Builders Workshop.
BUDGET CODES | DESCRIPTION | BUDGET ESTIMATE IN VATU | BUDGET NOTES I NARRATIVE | |
2: 100 | Material cost | 40,000vt | These are funds allocated for material cost | |
2:200 | Administration | 10.000vt | These are funds for Administrative costs such , | |
as telephone cards Stationeries etc | ||||
2:300 | Labours Wages | 80,000vt | These are funds allocated for Builders, Manager’s Allowance and workshop gardener | |
2:400 | Fuel cost | 70,000vt | These are funds allocated for fuel cost such as generator oil, Benzine, chain bar oil 2 stroke oil etc | |
2:500 | Transport | 10,000vt | Funds allocated for Transport .Such as Boat, Truck, Canoe etc— | |
2:600 | Food cost | 7,000vt | These are funds gathered for Builders, manager, workers food. | |
2: 700 | Others | 8,000vt | These are unforeseen or unexpected cost | |
TOTAL = | 225,000VT |
2014 ULUVEU BUILDERS WORKSHOP BUDGET EXPENDITURES TOTAL EXPENDITURE ESTIMATES 225,000VATU
6: Co-operation:
The co-operation of the Builders and Manager is very good. And also working committees of the palm project, but sometimes we have some misbehavior with each other, but somehow we short it out in a way that pleases everyone. With our good co operation the workshop develops very, very slowly to a standard that we want to be to help the people of Uluveu Island.
7: Achievements
Here are some Achievements for the workshop.
- Office setup
- Stationeries I workshop camera I Builders overalls.
- New Generator
- Light installment in the workshop
- Building of a project new toilet
- Repairmen’s of The Manager’s Hut
- New Inverter – 2,000 watts
- 2 New Electric planners
All these achievements were funded by NZCHET Aid. With the help of the palm project co-ordination officer (Miss Liane Farry)
NATURE OF EXPENSE
1 Material cost – 24,780vt
2 Labours wages – 53,860vt
3 Fuel cost – · 69,400vt
4 Transport 4,000vt
5 Administration cost -7,760vt
6 Others – 3,390vt
Total = 163,190vt
:- Total cash Balance = 63,086vt
:- Total Net Profit = 13,980vt
: – Reserve cash in Bank = 49,106vt
‘
6 MONTHS OF 2014 ULUVEU BUILDER’S WORKSHOP BUDGET
INCOME.
5 TOTAL INCOME ESTIMATE: 225,000VT
BUDGET CODES | DESCRIPTION | BUDGET ESTIMATES IN VATU | BUDGET NOTES |
1:100 | Chainsaw Hire | 100.000vt | Funds to be received from chainsaw Hired |
1:200 | Furniture Sales | 70.000vt | These are the funds to be received from furniture sales |
1:300 | Rent of Tools | 20,000vt | Funds to be received from the Tool rents |
1:400 | Generator Rent | 15,000vt | These are funds to be received
from generator Rent |
1:500 | Donation | 10,000vt | These are funds to be received
from Donors /etc |
10,000vt | These are funds received
inexpertly from different |
||
1: 600 Others | |||
Source, Bank interest etc |
|||
TOTALS 225,000VT |
ULUVEU BUILDER’S WORKSHOP REPORT FROM PERIOD 16th – FEBRUARY- 2013 TO 31st MAY -2014 PRESENTED TO NEW ZEALAND CHILDREN’S HEALTH EDUCATION TRUST (NZCHET)
1: Introduction: The name of the building Workshop is Uluveu BUILDERS WORKSHOP.
Since 2008 Uluveu Builder Workshop was established in Uluveu Island,
on Asivan station, Pescarus Village.
The 8 villages were consist of the Uluveu communities, they are :
1. Okai
2. Nerieniemb
3. Ayiomb
4. Ravuhen
5. Avock
6. Pelongk
7.Lutes
8.Pescarus
They are entitled to the ULUVEU BUIDER’S WORKSHOP.
2: Aim of the Pro ject
To develop the knowledge of the trained graduates’ students from URTC and the local build up their abilities of skills, such as carpentry wood work and etc… And to generate the income for the workshop to help the 8 communities to be sustainable to the future.
3: Workshop Operation
Since when the new Management gets in the workshop, we try all our best to make sure the operation ofthe workshop is running well, and on the i 6th – February- 2013 to the future.
4. Financial Report
From period of 16th February- 2013 to 31st May- 2014.
We try harder to earn money for the Workshop through these: –
NUTURE INCOMES.
1 Furniture sales = 75,5000vt
2 Chainsaw Hired = 76,500vt
3 Tool Rentals = 14,670vt
4 Generator Rentals = 5OOvt
5 Others 1O,OOOvt
Total = 177,170vt
The first carved design of the Palm Project. Designed by Elder John Akurkur Manager of the UBW.
New design for the UBW- design by the manager –
New office of the UBW.
A new office for the UBW designed by the manager.
Frames and windows with louvers on managers hut.
Builder’s of UBW re-flooring the floor of the manager’s hut.
The official declaration of the new 6,000 watt generator, by the president of Maskelynes Council of Chiefs Mr Gren Obediah.
Generator 6,000 watts on power in workshop.
Builder- Maraki Simeon chopping up slice for food shelf.
Kalo foreman of the UBW and two builders building wooden chairs for Malog Bungalow.
Kalo-The foreman completes the chairs vanished to be delivered to Malog Bungalow.
One married bed built by the UBW for Pastor’s House.